New Rates Effective February 1, 2024
The new monthly minimum is based on your meter size. The common meter size of most customers is a 5/8”x3/4”.
MONTHLY MINIMUMS
SIZE METER EQUIVALENTS RATE
-----------------‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑‑
5/8" X 3/4" 1.0 $ 29.00
3/4" 1.5 $ 43.50
1" 2.5 $ 72.50
1 1/2" 5.0 $ 145.00
2" 8.0 $ 232.00
3" DISP. 9.0 $ 261.00
3" CMPD. 16.0 $ 464.00
3" TURB. 17.5 $ 507.50
4" CMPD. 25.0 $ 725.00
4" TURB. 30.0 $ 870.00
6" CMPD. 50.0 $ 1,450.00
6" TURB. 62.5 $ 1,812.50
8" CMPD. 80.0 $ 2,320.00
The new water usage rate are as follows:
$1.50 per thousand gallons 0-2,000 gallons
$3.00 per thousand gallons 2,001-6,000 gallons
$4.00 per thousand gallons 6,001-10,000 gallons
$5.00 per thousand gallons 10,001-20,000 gallons
$6.00 per thousand gallons 20,001-40,000 gallons
$7.00 per thousand gallons 40,001-UP
The new Equity Buy in Fee is $3,000.
Installation fee if water line is on your side of the road is $4,100